ECNs not embedded in Tasks - why? It was fine in WC 8.

$
0
0

We have been "upgraded" to WC 10 for almost a year.  While I have learned to circumvent, or "customize" as it were, the new Windchill GUI in order to optimize my performance, there is still one feature that was available in WC 8 that I can't replicate in WC10.  This is the opening of a task "Name" and not being able to access the task "Subject". 

 

As an engineering manager who assigns ECNs to multiple designers, I now have to teach everyone how these two hyperlinks are drastically different.  In Windchill 8, the ECN/change task was embedded in the task.  Why is it different in 10?  Plus, since WC hijacks the right button click, it is more difficult to open these 2 in different tabs.  You've essentially created a disparate user experience.  Many times we have worked on the ECN/Change Task, loaded up the affected/resulting objects, then had to navigate back to the home screen, and then find the matching task name and send that one forward.  Did you ever think that we would have multiple tasks with the very similar names in our "my tasks" page.  Well, we do.  And it is much better to load up the resulting objects in the change task (embedded in the task itself), and then comfortably complete your assignment.  Is there a setting which will bring this back?

 

Below shows task name and subject.  I used to be able to access the "subject" when clicking on the "name".  Can we make this happen again?


Viewing all articles
Browse latest Browse all 6049

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>