is there a way to override a revision in windchill. we did a data migration from Intralink, and some of the revisions are at the incorrect revision. mainly due to new items being duplicated, the revs werent correct in intralink to begin with.
anyway, i have objects, that are at rev 4.1 in windchill, but the actual rev of the part is 1. is there any way to do this without deleting the object from commonspace, and reimporting.
thanks for your time